OFFUTT AFB REFUELING HYDRANT

High Level Verification

 

GSI used our COE-certified laboratory and professional engineer verifications in testing the concrete and soil to meet stringent specs for the Offutt AFB refueling system.

 

1,000-ft Pipeline Installed

 

A 1,000 ft. pipeline was passed beneath  the apron to prevent any construction that might hinder the use of the taxiway.

 

Timely Tests and Observation

 

GSI provided testing and observation verfication of the pipeline construction and soil compaction, concrete testing of the apron construction and a new fuel tank.

Special Security Clearances

 

Special security clearances were granted to GSI so field staff and equipment could be moved on and off the base. The security clearances included work with the Federal Nuclear Regulatory Commission and Radiation Safety Officer so nuclear testing gauges could be brought onto the base.